project
                
                
            
        Hagar Qim & Mnajdra Temples
General information
- 
                        Home page
                        
http://www.canobbio.com
 - 
                        Location country
                        
Malta
 - 
                        Year of construction
                        
2016
 - 
                        Name of the client/building owner
                        
Heritage Malta
 - 
                        Function of building
                        
Historical buildings & monuments
 - 
                        Degree of enclosure
                        
Open structure
 - 
                        Climatic zone
                        
Mediterranean - mild winters, dry hot summers
 - 
                        Number of layers
                        
mono-layer
 - 
                        Type of application of the membrane
                        
covering
 - 
                        Primary function of the tensile structure
                        
- Rain protection
 - Sun protection
 
 
Description
The philosophy behind the installation of protective shelters at Hagar Qim & Mnajdra is to immediately and significantly retard the main external causes of deterioration. This kind of shelter is low risk, speed and reversible.
Description of the environmental conditions
The environmental objectives were to protect the megalithic monuments from deterioration due to pollution, sun, rain and so on.
Material of the cover
- 
                        Cable-net/Fabric/Hybrid/Foil
                        
Fabric
 - 
                        Type (code)
                        
sheerfil I and sheerfil II
 - 
                        Material Fabric/Foil
                        
Glass fabric coated PTFE
 
Main dimensions and form
- 
                        Covered surface (m2)
                        
4500
 - 
                        Maximum height (m)
                        
10
 - 
                        Total length (m)
                        
70
 - 
                        Total width (m)
                        
70
 
Duration of use
- 
                        Temporary or permanent structure
                        
Permanent
 - 
                        Convertible or mobile
                        
Convertible
 - 
                        Design lifespan in years
                        
31-..
 
Involved companies
- 
                        Architects
                                                                                
Arch. Walter Hunziker
 - 
                            Engineers
                                                                                   
form TL ingenieure für tragwerk und leichtbau gmbh
 - 
                            Contractors
                                                                                     
Canobbio spa
 - 
                            Suppliers
                                                                                    
Canobbio spa
 
Editor
- 
                        Editor
                        
Stefania Lombardi