project
                
                
            
        TGV Train station, Nantes
General information
- 
                        Location address
                        Nantes
- 
                        Location country
                        France
- 
                        Year of construction
                        1991
- 
                        Year of replacement of membrane
                        2019
- 
                        Function of building
                        Vehicle services
- 
                        Degree of enclosure
                        Fully enclosed structure
- 
                        Climatic zone
                        Temperate - cold winters and mild summers
- 
                        Number of layers
                        mono-layer
- 
                        Type of application of the membrane
                        covering
- 
                        Primary function of the tensile structure
                        - Daylight gains
- Rain protection
 
Description of the environmental conditions
General comments, links
                                                        Architecture Textile
                                                        Le tensostrutture a membrana per l'architettura
                                                        TGV Nantes
                                                        
                                                        
                                
Material of the cover
- 
                        Cable-net/Fabric/Hybrid/Foil
                        Fabric
- 
                        Material Fabric/Foil
                        PES
- 
                        Material coating
                        PVC
Main dimensions and form
- 
                        Covered surface (m2)
                        950
- 
                        Form single element
                        Anticlastic
Duration of use
- 
                        Temporary or permanent structure
                        Temporary
- 
                        Design lifespan in years
                        11-20
Involved companies
- 
                        Architects
                                                                                SNCF, Departement Architecture
- 
                            Engineers
                                                                                   Malinowsky Marc
Editor
- 
                        Editor
                        Marijke M. Mollaert
 
                         
                         
                         
                         
                         
                         
                         
                        









