project
                
                
            
        CUBRE Membrane Architecture Warehouse Guatemala
General information
- 
                        Home page
                        www.cubre.com.gt
- 
                        Location address
                        Salama, Baja Verapaz
- 
                        Location country
                        Guatemala
- 
                        Year of construction
                        2013
- 
                        Name of the client/building owner
                        C U B R E, membrane Architecture, Central America
- 
                        Function of building
                        Industrial buildings
- 
                        Degree of enclosure
                        Fully enclosed structure
- 
                        Climatic zone
                        Tropical - hot and wet all year
- 
                        Number of layers
                        mono-layer
- 
                        Type of application of the membrane
                        covering
- 
                        Primary function of the tensile structure
                        - Daylight gains
- Rain protection
- Space defining elements
- Sun protection
- Thermal insulation
- Wind protection
 
Description
The use of color is the main feature in this Warehouse, used to protect membrane material, fabrics and welding machines, this simple architectural concept provides a clean and open space for working in our own projects and lives up to what we do: Membrane Technology.
Description of the environmental conditions
Material of the cover
- 
                        Cable-net/Fabric/Hybrid/Foil
                        Fabric
- 
                        Type (code)
                        Ferrari, Precontraint 502
- 
                        Material Fabric/Foil
                        Polyester/PVC/PVDF
- 
                        Material coating
                        Formula S: Calibrated PVDF alloy
Main dimensions and form
- 
                        Covered surface (m2)
                        200
Duration of use
- 
                        Temporary or permanent structure
                        Permanent
Involved companies
- 
                        Architects
                                                                                CUBRE
- 
                            Engineers
                                                                                   M. Eng. Edgar A. Mancilla Lopez
- 
                            Contractors
                                                                                     CUBRE
- 
                            Suppliers
                                                                                    SERGE FERRARI
Editor
- 
                        Editor
                        Edgar Mancilla
 
                         
                        









