Project Print this project
Extension of the Wilkhahn-factory | 1989 | Membrane | Germany

General information
Location address Bad Munder
Location country Germany
Year of construction 1989
Function of building Industrial buildings
Climatic zone Temperate - cold winters and mild summers
Misc. project details
References Wilkhahn-Produktionspavilion in Bad Münder - Deutsche Bauzeitung 5/1989
Frei Otto: Tetti Wilkhahn - DOMUS /1989
Duration of use
Temporary or permanent structure Temporary
Convertible or mobile Convertible
Design lifespan in years 00-05
Material of the cover
Cable-net/Textile/Hybrid/Foil Cable
Material Fabric/Foil Trevira high tenacity polyester
Material coating PVC
Main dimensions and form
Covered surface (m2) 450
Involved companies
Engineers Speich & Hinkes
Contractors Koit High-Tex GmbH
Editor
Editor Marijke Mollaert
 
Knowledgebase
Database
Library
Links
Order TensiNet Publications




 

developed by - kmo2web.be